Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2695

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2699

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/output.class.php on line 3581
citycenter – Sepahan Water Transplant Company

Isfahan City Center

Project Owner: Prestige Land Company

Location: Isfahan City Center Mall

Date: Spring     2018

Project Description:  Design and Construction of Sludge Dewatering Tank for the wastewater treatment plant

 

Isfahan Waste Management Company Sanitary Wastewater Treatment

Project Owner: Isfahan Municipality

Year: 2018

Capacity: 20 cubic meter per day

Methods: IFAS with Steel tanks

Designed and Constructed Wastewater Treatment Plant includes listed unites:

  • Aeriation and biological Treatment
  • Equalization Tank: 15 cubic meter polyethylene tank with bubble diffuser
  • Biological Treatment using IFAS method
  • Coagulation and Flocculation Tank
  • Chlorine injection tank
  • Wastewater storage tank