About Sepahan Water Transplant Company

  • About Us

Peyvand Ab Sepahan Technical Engineering Company, with the benefit of scientific and technical staff with experience and expertise in the field of technical engineering services and the construction of industrial sewage treatment plants, including the treatment of sewage from oil drilling also water and sewage projects, as well as modern desalination plant devices, started its activity in 2016. In line with its goals, this company tries to provide the best and highest quality assigned projects with all common standards, by recruiting experienced personnel and obtaining the relevant certificates. It is hoped that with the help of God, we will be able to serve this country.

 

Company Workshop

 

 

 

 

 

 

 

Contractor qualification certificate

Mr. Farjam Azhdari

Managing Director of  Peyvand Ab Sepahan Technical Engineering Company

Registration number:36613

With reference to enactment No. 48013/T23251H dated 2003/03/02 of the Board of Ministers and considering the fulfillment of the necessary conditions and approval of the company’s qualification in the comprehensive system for the recognition of the competence of executive system agents, By this means, the competence of that company to carry out contracting activities is announced from the date of issuance of this certificate until the end of the evaluation period and at the latest until 12/01/2025.

 

 

 

Isfahan technical and health protection research and education department

Certification training

Mr. Farjam Azhdari

Son of: Ali Saleh , birth certificate number: 972 , national ID number: 4269811382

He participated in the general occupational health and safety training course for employers and contractors with the code 319-99 from 22/08/2020 to 24/08/2020 for 20 hours at Center of Isfahan Safety Officers Trade Unions and was accepted with an average rank.

 

 

 

Accreditation certificate safe contractor

In the implementation of the note of Article 2 of the Contractor’s Safety Regulations, approved on 12/03/88 by the Supreme Council of Technical Protection, the safety qualification of Peyvand Ab Sepahan Technical Engineering Company

Manager: Mr. Farjam Azhdari

National ID number: 4269811382

Address: Isfahan – Chaharbagh Khajoo Street – Sadrkhajoo Office Complex, second floor – Unit 204

tell: 09132241275

Company registration ID: 36613 , Company registration date: 12/1/2010 , Company  National ID number: 10860226951

Field of the activity: In the field of water – facilities and equipment

It was approved by the provincial safety qualification committee. This certificate is valid for two years from the date of issuance, subject to cancellation and suspension conditions

 

 

 

Ministry of Industry, Mine and Trade

Engineering license

According to the expertise, experience records and the projects carried out,

 

According to this license, Peyvand Ab Sepahan Technical Engineering Company (Private Corporation), registration number 36613 dated 10/04/2009 and national ID number 10860226951 in the Registration of companies and non-commercial organizations, managing director: Mr. Farjam Azhdari located in Isfahan – Chaharbagh Khajoo Street – Sadrkhajoo Office Complex, second floor – Unit 204

Field of activity: Technical engineering services in the field of and sewage treatment

It is allowed to provide engineering activities in the industry and mining sector

 

 

 

 

Ministry of Industry, Mine and Trade

Research and Development Licensee

 

Considering that, Peyvand Ab Sepahan Technical Engineering Company has technical engineering license No. 16679/1343005 dated 23/05/2020  from the Ministry of Industry, Mine and Trade and has the necessary capability to carry out development and application research activities, Based on the guidelines for issuing a license for research and development activities, this license is granted to that company.

 

 

ISO 90001, 10004, 14001 certificates

 

Appreciation certificate of the Region 5 mayor

 Certificate of appreciation 

Managing director of Peyvand Ab Sepahan Technical Engineering Company

Hereby appreciate your valuable efforts in the implementation of the construction of coagulation and flocculation tanks project in Sepahan Shahr, Region 5 of Isfahan municipality in 2021, and ask God to wish you good health and continued success in serving the citizens.

 

 

 

  • Samples of Company Activities

Design, construction, installation and initiation of industrial, municipal and petroleum wastewater treatment plants

 

  • Design and construction biological treatment packages for sanitary, industrial and petroleum wastewaters with the following methods:

DAF, MBR, IFAS. SBR, MBBR, UASB and sewage treatment by herbal method (WETLAND)

 

ifasگیاه پالایی| شرکت پیوند آب سپاهان

 

 

row Project name employer   operations description Date of contract
1 buying all of the equipment and installations related to the sewage treatment system of the mortuary of the Isfahan Bagh e Rezvan cemetery Cemetery organization of Isfahan municipality building a treatment plant with a capacity of 5 cubic meters per day 2021
2 Design, purchase, installation and operation of the industrial sewage treatment plant of Alumroll Novin Company in Arak by EPC method Arak Alumroll Novin Company building an industrial treatment plant with a capacity of 1100 cubic meters per day 2020
3 The contract for the optimization of the existing treatment plant until reaching the desired standards Polar Company Designing all the required equipment of the treatment plant in order to bring the quality of the effluent to the approved standard of the environment 2020
4 Contract for the design of the treatment plant and supervision in the implementation and obtaining of the environmental permit Zagros Milk and Meat Company Research and consulting, design and supervision of the implementation and completion of the sewage treatment plant electrical system project and preparation of plans 2020
5 Coagulation, flocculation and sedimentation system of Sepahan Shahr  supplementary sewage treatment plant by EPC method Isfahan Municipality Coagulation, flocculation and sedimentation system of Sepahan Shahr sewage treatment plant 2020
6 Design, construction and installation of the greywater treatment package of Harat Stadium, Yazd Province Yazd water and sewage Graywater treatment package with a capacity of 15 cubic meters per day 2019-2020
7 Design, construction and installation of the sewage treatment plant of Fatemeh Al-Zahra Hospital Effluents in Kovar Shiraz university of medical sciences Treatment plant with a capacity of 50 cubic meters per day 2019-2020
8 Design, construction and installation of the greywater treatment system of Haft Dast residential building Personal Greywater treatment with a capacity of 1 cubic meter per day 2019
9 Design, construction and installation of sewage treatment plant of Ardestan Shahid Beheshti Hospital Isfahan University of Medical Sciences Treatment plant with a capacity of 70 cubic meters per day 2019
10 Design, construction and installation of sanitary sewage treatment plant of Shirvan prison North Khorasan Prisons Organization MBBR treatment plant with a capacity of 300 cubic meters per day 2019
11 Renovation of the sewage route of Shariat Razavi Hospital in Tehran Shariat Razavi Hospital 2019
12 Design, construction and installation of sewage treatment plant of Khatam Al Anbia Hospital, Natanz Isfahan University of Medical Sciences Treatment plant with a capacity of 70 cubic meters per day 2018-2019
13 Design, construction and installation of greywater treatment system of Golnor factory Golnor Company Greywater treatment with a capacity of 3 cubic meters per day 2018
14 Designing the treatment plant and supervising the implementation and obtaining the environmental permit Naein Zarrin Company Naein Zarrin Company 2018
15 Mr. Amirian’s treatment plant design cake and cookie Taam Afarin Spadana factory 2018
16 The design of the treatment plant and supervision in the implementation and obtaining the animal husbandry environment permit of Mr. Nasiri Mr. Nasiri’s animal husbandry 2018
17 Design, construction and installation of the sewage treatment system of Al-Ghadir mosque in the new city of Hashtgerd Hashtgerd municipality sewage treatment with a capacity of 5 cubic meters per day 2018
18 Design, construction and installation of the greywater treatment system of Isfahan Gas Department Gas Administration of Isfahan Province Greywater treatment with a capacity of 3 cubic meters per day 2018
19 Design, construction and installation of sanitary sewage treatment package for Matin Abad tourism camp Tourism Department sewage treatment with a capacity of 20 cubic meters per day 2018
20 Design, construction, installation and operation of Binaloud animal husbandry industrial treatment plant Binaloud Agricultural and Animal Husbandry Company Implementation of MBBR sewage treatment plant with a capacity of 200 cubic meters per day 2017-2018
21 Design and manufacture of sludge concentration package Prestige Land Iran Isfahan City ​​Center 2017
22 Design, purchase, installation and operation of the sewage treatment plant with the IFAS method for Matin Sabz Zayandeh Roud Company Matin Sabz Zayandeh Roud Company Implementation of IFAS sewage treatment plant with a capacity of 15 cubic meters per day 2017
23 Design, purchase, installation and operation of sewage treatment plant of Sana Protein Company Sana Protein Company Implementation of a treatment plant with a capacity of 10 cubic meters 2017
24 Designe, purchase and operation of the MBR package of Kelishad Isfahan Gas Co Implementation of MBR package with a capacity of 3 cubic meters per day 2017
25 Design and construction of the sewage treatment plant of Qahdarijan  gas company by using SBR method Isfahan Gas Co 2017
26 Design, construction and installation of sewage treatment plant of Isfahan Recycling Department by using IFAS method Isfahan Municipality Designing a treatment plant using the IFAS method with a capacity of 15 cubic meters per day 2017
27 Implementation of installation and change of water branch  in the four districts of Shahrari Municipality Shahrari Municipality 2017
28 Design, purchase, installation, and operation of sewage treatment of Vahdat dairy products factory in Isfahan Vahdat Espadan animal products factory Implementation of IFAS sewage treatment plant with a capacity of 500 cubic meters per day 2016-2017
29 Design, purchase, installation, and operation of the sewage treatment package for Kohsar Park in Tehran Tehran Municipality Implementing a sewage treatment package with a capacity of 7 cubic meters per day 2016
30 Preservation and maintenance of Fooladshahr sewage station Fooladshahr Municipality 2016
31 Improving and developing the water distribution network of Shahreza cities Isfahan Rural Water and Wastewater Company 2016
32 Construction of sewage treatment package for Biopolymer company Zist Polymer Company Implementation of industrial sewage treatment package 2015
33 Implementation of the sewage transfer line under the pressure of the sewage network of the Isfahan sugar factory Isfahan sugar factory 1200 meters long sewage transmission line of sewage treatment plant 2013
34 Designing, purchasing and operation of the MBR package of Kelishad Isfahan Gas Co Implementation of MBR package with a capacity of 3 cubic meters per day 2017
35 Design and construction of the sewage treatment plant of Qahdarijan gas company by using SBR method Isfahan Gas Co 2017
36 Design, construction and installation of sewage treatment plant of Isfahan Recycling Department using IFAS method Isfahan Municipality Designing a treatment plant using the IFAS method with a capacity of 15 cubic meters per day 2017
37 Implementation of installation and change of water branch  in the four districts of Shahrari Municipality Shahrari Municipality 2017
38 Design, purchase, installation, and operation of sewage treatment of Vahdat dairy products factory in Isfahan Vahdat Espadan animal products factory Implementation of IFAS sewage treatment plant with a capacity of 500 cubic meters per day 2016-2017
39 Design, purchase, installation, and operation of the sewage treatment package for Kohsar Park in Tehran Tehran Municipality Implementing a sewage treatment package with a capacity of 7 cubic meters per day 2016
40 Preservation and maintenance of Fooladshahr sewage station Fooladshahr Municipality 2016
41 Improving and developing the water distribution network of Shahreza cities Isfahan Rural Water and Wastewater Company 2016
42 Construction of sewage treatment package for Biopolymer company Zist Polymer Company Implementation of industrial sewage treatment package 2015
43 Implementation of the sewage transfer line under the pressure of the sewage network of the Isfahan sugar factory Isfahan sugar factory 1200 meters long sewage transmission line of sewage treatment plant 2013

 

Samples of Work Records

 

Employer: Municipality of district 5 Isfahan

Project Title: Coagulation and flocculation construction operation of Sepahan Shahr supplementary sewage treatment plant in two modules with a capacity of 70 liters per second

Description of the process:

Bar screen: in the form of Drum Screen

Coagulation and flocculation tank: for quick and slow mixing and flocculation of sewage

Sedimentation: To settle the clots resulting from chemical coagulation

Injection tanks: for injecting chemicals

 

 

The design and construction of Sepahan Shahr supplementary sewage treatment plant is EPC, and all stages of design, construction of tanks and ponds and operation have been done by this company.

 

 

 

Employer: Arak Alumroll Novin Company

Project Title: Design, construction, installation and operation of the treatment plant of Novin Arak Alumroll Factory by coagulation and flocculation method with a capacity of 800 cubic meters per day by using EPC method.

Description of the process:

  • Balanced and aerated ponds
  • coagulation and flocculation system
  • Sedimentation system
  • Storage and PH adjustment system
  • Chemical and control room

 

 

Employer: Polar Company

Project Title: Consultancy and supervision contract for the treatment plant of Polar Pooya Company until reaching the desired standards

Description of the process:

– Presentation of the schedule program

– Conducting required tests during the project

– Preparing a list of required equipment

– Providing pipping maps

– Supervising the installation of electromechanical equipment and preparing manuals and operating training

– And etc.

Employer: Yazd Water and Wastewater Company

Project Title: Design, construction and installation of greywater treatment package for Harat Stadium in Yazd province, with a capacity of 15 cubic meters per day

Description of the process:

– Bar screen: Separation of coarse particles of sewage

– Balancer: collecting sewage and aerating it

– Coagulation: Injecting chemicals and increasing the rate of sedimentation

– Flocculation: gentle mixing to form flocs

– Primary sedimentation: in order to separate large suspended solids

– Chlorination: to disinfect the carcass of microorganisms

 

 

Employer: Shiraz University of Medical Sciences

Project Title: Design, construction and installation of the sewage treatment plant of Fatemeh Al-Zahra Hospital in Kovar with a capacity of 50 cubic meters per day

Description of the process:

Bar screen: Separation of coarse particles of sewage

Pumping station: transferring sewage to the package

IFAS biological treatment: for sewage aeration

Sedimentation: in order to separate large suspended solids

Disinfection pool: to disinfect the carcass of microorganisms

 

 

Employer: personal

Project Title: Design, construction and installation of the greywater treatment system of Haft Hand residential building with a capacity of 5 cubic meters per day

Description of the process:

Balancing pond: To balance sewage

Bar screen: Separation of coarse particles of sewage

Aeration: prevent odor

Filtration: separation of solids and suspended particles

Disinfection to disinfect the carcass of microorganisms

Employer: Isfahan University of Medical Sciences

Project Title: Design, construction and installation of sewage treatment plant of Shahid Beheshti Hospital in Ardestan with a capacity of 70 cubic meters per day

Description of the process:

Bar screen: Separation of coarse particles of sewage

Pumping station: transfer of wastewater to treatment plant tanks

Balancer: for equalization of wastewater

Biological treatment: to aerate the sewage

Sedimentation: settling of coarse and suspended particles in sewage

Disinfection pool: to disinfect the carcass of microorganisms

Filtration: To separate mud, sand particles and bacteria

 

Employer: administrative office of North Khorasan Prisons

Project Title: Design, construction and installation of Shirvan prison sanitary sewage treatment plant with a capacity of 300 cubic meters per day

Description of the process:

Bar screen: Separation of coarse particles of sewage

Pumping station: transfer of wastewater to treatment plant tanks

Balancer: for equalization of wastewater

Biological treatment: to aerate the sewage

Sedimentation: settling of coarse and suspended particles in sewage

Disinfection pool: to disinfect the carcass of microorganisms

 

Employer: Isfahan University of Medical Sciences

Project Title: Design, construction and installation of sewage treatment plant of Khatam Al Anbia Hospital in Natanz with a capacity of 70 cubic meters per day

Description of the process:

Bar screen: Separation of coarse particles of sewage

Pumping station: transfer of wastewater to treatment plant tanks

Balancer: for equalization of wastewater

Biological treatment: to aerate the sewage

Sedimentation: settling of coarse and suspended particles in sewage

Disinfection pool: to disinfect the carcass of microorganisms

Filtration: To separate mud, sand particles and bacteria

Employer: Vahdat Farmers and industrial livestock breeder’s cooperative company

Project Title: Design, purchase, installation, commissioning and operation of wastewater treatment of Vahdat dairy products factory in Isfahan with a capacity of 500 cubic meters per day.

Description of the process:

Bar screen: Separation of coarse particles of sewage

Grit chamber: Separation of particles that are denser than water.

Primary sedimentation: in order to separate large suspended solids

Injection of chemicals: coagulation of materials and increasing the rate of sedimentation.

Balancing pond: To balance sewage

DAF degreaser: flotation of fats with air and separation from Wastewater

Anaerobic tank (UASB): Anaerobic treatment using granules

Biological treatment IFAS: to aerate the sewage

Disinfection pool: to disinfect the carcass of microorganisms

Sand filter: to separate mud, sand particles and bacteria

Employer: Binaloud Agricultural and Animal Husbandry Company in Neyshabur

Project Title: Design, construction, installation and operation of Binaloud animal husbandry industrial treatment plant with a capacity of 200 cubic meters per day

Description of the process:

Bar screen: Separation of coarse particles of sewage

Balancing: for equalization of wastewater

Sedimentation and Injection of chemicals: coagulation of materials and increasing the rate of sedimentation.

DAF degreaser: flotation of fats with air and separation from Wastewater

Anaerobic tank (USBR): Anaerobic treatment using granules

Biological treatment IFAS: to aerate the sewage

Disinfection pool: to disinfect the carcass of microorganisms

Sand filter: to separate mud, sand particles and bacteria

Employer: Matin Sabz Zayandeh Roud Company

Project Title: Design, purchase, installation and commissioning of a sewage treatment plant with the IFAS method of Matin Sabz Zayandeh Rood Company with a capacity of 20 cubic meters per day.

Description of the process:

 Biological treatment IFAS: To aerate the wastewater with the presence of media and aeration by a blower

Sedimentation and Injection of chemicals: coagulation of materials and increasing the rate of sedimentation.

Disinfection pool: to disinfect the carcass of microorganisms

Employer: Sana Protein Company

Project Title: Design, purchase, installation and commissioning of sewage treatment plant of Sana Protein Company with a capacity of 30 cubic meters per day

Description of the process:

The concrete structures were ready in the ground and the purification steps are as follows:

DAF degreaser: flotation of fats with air and separate them from Wastewater

Balancing: To separate large suspended solids

Anaerobic treatment: in two parts aerated effluent to reduce BOD

Aerobic treatment: to remove microorganisms

Sedimentation:  Post-aeration to settle the created sludge and enter the sludge concentration system

 

 

 

Employer: Gas Administration of Isfahan Province

Project Title:

  • Design, purchase, installation and operation of the MBR package of Kelishad

Design and construction of wastewater treatment plant of Isfahan gas company, Qahdarijan branch, using SBR method

Description of the process:

  1. In order to set up the MBR package of the Gas Administration, a screen bar and MBR system has been used in the form of fixed plates
  2. B In order to design the SBR system of the gas administration, 5 steps have been designed:

In the first step, the wastewater enters from the septic to the aeration tank, and after aeration, the blower is turned off and

sedimentation takes place, and then chlorination is performed and the steps are repeated.

 

 

Address:

Isfahan – Chaharbagh Khajoo Street – Sadrkhajoo Office Complex, second floor – Unit 204

tell: 09132241275-09131123580

fax:03132732372

Email: peyvandabsepahan.co@gmail.com

Website: www.peyvandab-s.com

  peyvandabsepahan.co