About Sepahan Water Transplant Company

- About Us
Peyvand Ab Sepahan Technical Engineering Company, with the benefit of scientific and technical staff with experience and expertise in the field of technical engineering services and the construction of industrial sewage treatment plants, including the treatment of sewage from oil drilling also water and sewage projects, as well as modern desalination plant devices, started its activity in 2016. In line with its goals, this company tries to provide the best and highest quality assigned projects with all common standards, by recruiting experienced personnel and obtaining the relevant certificates. It is hoped that with the help of God, we will be able to serve this country.
Company Workshop
Contractor qualification certificate
Mr. Farjam Azhdari
Managing Director of Peyvand Ab Sepahan Technical Engineering Company
Registration number:36613
With reference to enactment No. 48013/T23251H dated 2003/03/02 of the Board of Ministers and considering the fulfillment of the necessary conditions and approval of the company’s qualification in the comprehensive system for the recognition of the competence of executive system agents, By this means, the competence of that company to carry out contracting activities is announced from the date of issuance of this certificate until the end of the evaluation period and at the latest until 12/01/2025.
Isfahan technical and health protection research and education department
Certification training
Mr. Farjam Azhdari
Son of: Ali Saleh , birth certificate number: 972 , national ID number: 4269811382
He participated in the general occupational health and safety training course for employers and contractors with the code 319-99 from 22/08/2020 to 24/08/2020 for 20 hours at Center of Isfahan Safety Officers Trade Unions and was accepted with an average rank.
Accreditation certificate safe contractor
In the implementation of the note of Article 2 of the Contractor’s Safety Regulations, approved on 12/03/88 by the Supreme Council of Technical Protection, the safety qualification of Peyvand Ab Sepahan Technical Engineering Company
Manager: Mr. Farjam Azhdari
National ID number: 4269811382
Address: Isfahan – Chaharbagh Khajoo Street – Sadrkhajoo Office Complex, second floor – Unit 204
tell: 09132241275
Company registration ID: 36613 , Company registration date: 12/1/2010 , Company National ID number: 10860226951
Field of the activity: In the field of water – facilities and equipment
It was approved by the provincial safety qualification committee. This certificate is valid for two years from the date of issuance, subject to cancellation and suspension conditions
Ministry of Industry, Mine and Trade
Engineering license
According to the expertise, experience records and the projects carried out,
According to this license, Peyvand Ab Sepahan Technical Engineering Company (Private Corporation), registration number 36613 dated 10/04/2009 and national ID number 10860226951 in the Registration of companies and non-commercial organizations, managing director: Mr. Farjam Azhdari located in Isfahan – Chaharbagh Khajoo Street – Sadrkhajoo Office Complex, second floor – Unit 204
Field of activity: Technical engineering services in the field of and sewage treatment
It is allowed to provide engineering activities in the industry and mining sector
Ministry of Industry, Mine and Trade
Research and Development Licensee
Considering that, Peyvand Ab Sepahan Technical Engineering Company has technical engineering license No. 16679/1343005 dated 23/05/2020 from the Ministry of Industry, Mine and Trade and has the necessary capability to carry out development and application research activities, Based on the guidelines for issuing a license for research and development activities, this license is granted to that company.
ISO 90001, 10004, 14001 certificates
Appreciation certificate of the Region 5 mayor
Certificate of appreciation
Managing director of Peyvand Ab Sepahan Technical Engineering Company
Hereby appreciate your valuable efforts in the implementation of the construction of coagulation and flocculation tanks project in Sepahan Shahr, Region 5 of Isfahan municipality in 2021, and ask God to wish you good health and continued success in serving the citizens.
- Samples of Company Activities
Design, construction, installation and initiation of industrial, municipal and petroleum wastewater treatment plants
- Design and construction biological treatment packages for sanitary, industrial and petroleum wastewaters with the following methods:
DAF, MBR, IFAS. SBR, MBBR, UASB and sewage treatment by herbal method (WETLAND)
row | Project name | employer | operations description | Date of contract |
1 | buying all of the equipment and installations related to the sewage treatment system of the mortuary of the Isfahan Bagh e Rezvan cemetery | Cemetery organization of Isfahan municipality | building a treatment plant with a capacity of 5 cubic meters per day | 2021 |
2 | Design, purchase, installation and operation of the industrial sewage treatment plant of Alumroll Novin Company in Arak by EPC method | Arak Alumroll Novin Company | building an industrial treatment plant with a capacity of 1100 cubic meters per day | 2020 |
3 | The contract for the optimization of the existing treatment plant until reaching the desired standards | Polar Company | Designing all the required equipment of the treatment plant in order to bring the quality of the effluent to the approved standard of the environment | 2020 |
4 | Contract for the design of the treatment plant and supervision in the implementation and obtaining of the environmental permit | Zagros Milk and Meat Company | Research and consulting, design and supervision of the implementation and completion of the sewage treatment plant electrical system project and preparation of plans | 2020 |
5 | Coagulation, flocculation and sedimentation system of Sepahan Shahr supplementary sewage treatment plant by EPC method | Isfahan Municipality | Coagulation, flocculation and sedimentation system of Sepahan Shahr sewage treatment plant | 2020 |
6 | Design, construction and installation of the greywater treatment package of Harat Stadium, Yazd Province | Yazd water and sewage | Graywater treatment package with a capacity of 15 cubic meters per day | 2019-2020 |
7 | Design, construction and installation of the sewage treatment plant of Fatemeh Al-Zahra Hospital Effluents in Kovar | Shiraz university of medical sciences | Treatment plant with a capacity of 50 cubic meters per day | 2019-2020 |
8 | Design, construction and installation of the greywater treatment system of Haft Dast residential building | Personal | Greywater treatment with a capacity of 1 cubic meter per day | 2019 |
9 | Design, construction and installation of sewage treatment plant of Ardestan Shahid Beheshti Hospital | Isfahan University of Medical Sciences | Treatment plant with a capacity of 70 cubic meters per day | 2019 |
10 | Design, construction and installation of sanitary sewage treatment plant of Shirvan prison | North Khorasan Prisons Organization | MBBR treatment plant with a capacity of 300 cubic meters per day | 2019 |
11 | Renovation of the sewage route of Shariat Razavi Hospital in Tehran | Shariat Razavi Hospital | — | 2019 |
12 | Design, construction and installation of sewage treatment plant of Khatam Al Anbia Hospital, Natanz | Isfahan University of Medical Sciences | Treatment plant with a capacity of 70 cubic meters per day | 2018-2019 |
13 | Design, construction and installation of greywater treatment system of Golnor factory | Golnor Company | Greywater treatment with a capacity of 3 cubic meters per day | 2018 |
14 | Designing the treatment plant and supervising the implementation and obtaining the environmental permit Naein Zarrin Company | Naein Zarrin Company | — | 2018 |
15 | Mr. Amirian’s treatment plant design | cake and cookie Taam Afarin Spadana factory | — | 2018 |
16 | The design of the treatment plant and supervision in the implementation and obtaining the animal husbandry environment permit of Mr. Nasiri | Mr. Nasiri’s animal husbandry | — | 2018 |
17 | Design, construction and installation of the sewage treatment system of Al-Ghadir mosque in the new city of Hashtgerd | Hashtgerd municipality | sewage treatment with a capacity of 5 cubic meters per day | 2018 |
18 | Design, construction and installation of the greywater treatment system of Isfahan Gas Department | Gas Administration of Isfahan Province | Greywater treatment with a capacity of 3 cubic meters per day | 2018 |
19 | Design, construction and installation of sanitary sewage treatment package for Matin Abad tourism camp | Tourism Department | sewage treatment with a capacity of 20 cubic meters per day | 2018 |
20 | Design, construction, installation and operation of Binaloud animal husbandry industrial treatment plant | Binaloud Agricultural and Animal Husbandry Company | Implementation of MBBR sewage treatment plant with a capacity of 200 cubic meters per day | 2017-2018 |
21 | Design and manufacture of sludge concentration package | Prestige Land Iran | Isfahan City Center | 2017 |
22 | Design, purchase, installation and operation of the sewage treatment plant with the IFAS method for Matin Sabz Zayandeh Roud Company | Matin Sabz Zayandeh Roud Company | Implementation of IFAS sewage treatment plant with a capacity of 15 cubic meters per day | 2017 |
23 | Design, purchase, installation and operation of sewage treatment plant of Sana Protein Company | Sana Protein Company | Implementation of a treatment plant with a capacity of 10 cubic meters | 2017 |
24 | Designe, purchase and operation of the MBR package of Kelishad | Isfahan Gas Co | Implementation of MBR package with a capacity of 3 cubic meters per day | 2017 |
25 | Design and construction of the sewage treatment plant of Qahdarijan gas company by using SBR method | Isfahan Gas Co | — | 2017 |
26 | Design, construction and installation of sewage treatment plant of Isfahan Recycling Department by using IFAS method | Isfahan Municipality | Designing a treatment plant using the IFAS method with a capacity of 15 cubic meters per day | 2017 |
27 | Implementation of installation and change of water branch in the four districts of Shahrari Municipality | Shahrari Municipality | — | 2017 |
28 | Design, purchase, installation, and operation of sewage treatment of Vahdat dairy products factory in Isfahan | Vahdat Espadan animal products factory | Implementation of IFAS sewage treatment plant with a capacity of 500 cubic meters per day | 2016-2017 |
29 | Design, purchase, installation, and operation of the sewage treatment package for Kohsar Park in Tehran | Tehran Municipality | Implementing a sewage treatment package with a capacity of 7 cubic meters per day | 2016 |
30 | Preservation and maintenance of Fooladshahr sewage station | Fooladshahr Municipality | — | 2016 |
31 | Improving and developing the water distribution network of Shahreza cities | Isfahan Rural Water and Wastewater Company | — | 2016 |
32 | Construction of sewage treatment package for Biopolymer company | Zist Polymer Company | Implementation of industrial sewage treatment package | 2015 |
33 | Implementation of the sewage transfer line under the pressure of the sewage network of the Isfahan sugar factory | Isfahan sugar factory | 1200 meters long sewage transmission line of sewage treatment plant | 2013 |
34 | Designing, purchasing and operation of the MBR package of Kelishad | Isfahan Gas Co | Implementation of MBR package with a capacity of 3 cubic meters per day | 2017 |
35 | Design and construction of the sewage treatment plant of Qahdarijan gas company by using SBR method | Isfahan Gas Co | — | 2017 |
36 | Design, construction and installation of sewage treatment plant of Isfahan Recycling Department using IFAS method | Isfahan Municipality | Designing a treatment plant using the IFAS method with a capacity of 15 cubic meters per day | 2017 |
37 | Implementation of installation and change of water branch in the four districts of Shahrari Municipality | Shahrari Municipality | — | 2017 |
38 | Design, purchase, installation, and operation of sewage treatment of Vahdat dairy products factory in Isfahan | Vahdat Espadan animal products factory | Implementation of IFAS sewage treatment plant with a capacity of 500 cubic meters per day | 2016-2017 |
39 | Design, purchase, installation, and operation of the sewage treatment package for Kohsar Park in Tehran | Tehran Municipality | Implementing a sewage treatment package with a capacity of 7 cubic meters per day | 2016 |
40 | Preservation and maintenance of Fooladshahr sewage station | Fooladshahr Municipality | — | 2016 |
41 | Improving and developing the water distribution network of Shahreza cities | Isfahan Rural Water and Wastewater Company | — | 2016 |
42 | Construction of sewage treatment package for Biopolymer company | Zist Polymer Company | Implementation of industrial sewage treatment package | 2015 |
43 | Implementation of the sewage transfer line under the pressure of the sewage network of the Isfahan sugar factory | Isfahan sugar factory | 1200 meters long sewage transmission line of sewage treatment plant | 2013 |
Samples of Work Records
Employer: Municipality of district 5 Isfahan
Project Title: Coagulation and flocculation construction operation of Sepahan Shahr supplementary sewage treatment plant in two modules with a capacity of 70 liters per second
Description of the process:
Bar screen: in the form of Drum Screen
Coagulation and flocculation tank: for quick and slow mixing and flocculation of sewage
Sedimentation: To settle the clots resulting from chemical coagulation
Injection tanks: for injecting chemicals
The design and construction of Sepahan Shahr supplementary sewage treatment plant is EPC, and all stages of design, construction of tanks and ponds and operation have been done by this company.
Employer: Arak Alumroll Novin Company
Project Title: Design, construction, installation and operation of the treatment plant of Novin Arak Alumroll Factory by coagulation and flocculation method with a capacity of 800 cubic meters per day by using EPC method.
Description of the process:
- Balanced and aerated ponds
- coagulation and flocculation system
- Sedimentation system
- Storage and PH adjustment system
- Chemical and control room
Employer: Polar Company
Project Title: Consultancy and supervision contract for the treatment plant of Polar Pooya Company until reaching the desired standards
Description of the process:
– Presentation of the schedule program
– Conducting required tests during the project
– Preparing a list of required equipment
– Providing pipping maps
– Supervising the installation of electromechanical equipment and preparing manuals and operating training
– And etc.
Employer: Yazd Water and Wastewater Company
Project Title: Design, construction and installation of greywater treatment package for Harat Stadium in Yazd province, with a capacity of 15 cubic meters per day
Description of the process:
– Bar screen: Separation of coarse particles of sewage
– Balancer: collecting sewage and aerating it
– Coagulation: Injecting chemicals and increasing the rate of sedimentation
– Flocculation: gentle mixing to form flocs
– Primary sedimentation: in order to separate large suspended solids
– Chlorination: to disinfect the carcass of microorganisms
Employer: Shiraz University of Medical Sciences
Project Title: Design, construction and installation of the sewage treatment plant of Fatemeh Al-Zahra Hospital in Kovar with a capacity of 50 cubic meters per day
Description of the process:
Bar screen: Separation of coarse particles of sewage
Pumping station: transferring sewage to the package
IFAS biological treatment: for sewage aeration
Sedimentation: in order to separate large suspended solids
Disinfection pool: to disinfect the carcass of microorganisms
Employer: personal
Project Title: Design, construction and installation of the greywater treatment system of Haft Hand residential building with a capacity of 5 cubic meters per day
Description of the process:
Balancing pond: To balance sewage
Bar screen: Separation of coarse particles of sewage
Aeration: prevent odor
Filtration: separation of solids and suspended particles
Disinfection to disinfect the carcass of microorganisms
Employer: Isfahan University of Medical Sciences
Project Title: Design, construction and installation of sewage treatment plant of Shahid Beheshti Hospital in Ardestan with a capacity of 70 cubic meters per day
Description of the process:
Bar screen: Separation of coarse particles of sewage
Pumping station: transfer of wastewater to treatment plant tanks
Balancer: for equalization of wastewater
Biological treatment: to aerate the sewage
Sedimentation: settling of coarse and suspended particles in sewage
Disinfection pool: to disinfect the carcass of microorganisms
Filtration: To separate mud, sand particles and bacteria
Employer: administrative office of North Khorasan Prisons
Project Title: Design, construction and installation of Shirvan prison sanitary sewage treatment plant with a capacity of 300 cubic meters per day
Description of the process:
Bar screen: Separation of coarse particles of sewage
Pumping station: transfer of wastewater to treatment plant tanks
Balancer: for equalization of wastewater
Biological treatment: to aerate the sewage
Sedimentation: settling of coarse and suspended particles in sewage
Disinfection pool: to disinfect the carcass of microorganisms
Employer: Isfahan University of Medical Sciences
Project Title: Design, construction and installation of sewage treatment plant of Khatam Al Anbia Hospital in Natanz with a capacity of 70 cubic meters per day
Description of the process:
Bar screen: Separation of coarse particles of sewage
Pumping station: transfer of wastewater to treatment plant tanks
Balancer: for equalization of wastewater
Biological treatment: to aerate the sewage
Sedimentation: settling of coarse and suspended particles in sewage
Disinfection pool: to disinfect the carcass of microorganisms
Filtration: To separate mud, sand particles and bacteria
Employer: Vahdat Farmers and industrial livestock breeder’s cooperative company
Project Title: Design, purchase, installation, commissioning and operation of wastewater treatment of Vahdat dairy products factory in Isfahan with a capacity of 500 cubic meters per day.
Description of the process:
Bar screen: Separation of coarse particles of sewage
Grit chamber: Separation of particles that are denser than water.
Primary sedimentation: in order to separate large suspended solids
Injection of chemicals: coagulation of materials and increasing the rate of sedimentation.
Balancing pond: To balance sewage
DAF degreaser: flotation of fats with air and separation from Wastewater
Anaerobic tank (UASB): Anaerobic treatment using granules
Biological treatment IFAS: to aerate the sewage
Disinfection pool: to disinfect the carcass of microorganisms
Sand filter: to separate mud, sand particles and bacteria
Employer: Binaloud Agricultural and Animal Husbandry Company in Neyshabur
Project Title: Design, construction, installation and operation of Binaloud animal husbandry industrial treatment plant with a capacity of 200 cubic meters per day
Description of the process:
Bar screen: Separation of coarse particles of sewage
Balancing: for equalization of wastewater
Sedimentation and Injection of chemicals: coagulation of materials and increasing the rate of sedimentation.
DAF degreaser: flotation of fats with air and separation from Wastewater
Anaerobic tank (USBR): Anaerobic treatment using granules
Biological treatment IFAS: to aerate the sewage
Disinfection pool: to disinfect the carcass of microorganisms
Sand filter: to separate mud, sand particles and bacteria
Employer: Matin Sabz Zayandeh Roud Company
Project Title: Design, purchase, installation and commissioning of a sewage treatment plant with the IFAS method of Matin Sabz Zayandeh Rood Company with a capacity of 20 cubic meters per day.
Description of the process:
Biological treatment IFAS: To aerate the wastewater with the presence of media and aeration by a blower
Sedimentation and Injection of chemicals: coagulation of materials and increasing the rate of sedimentation.
Disinfection pool: to disinfect the carcass of microorganisms
Employer: Sana Protein Company
Project Title: Design, purchase, installation and commissioning of sewage treatment plant of Sana Protein Company with a capacity of 30 cubic meters per day
Description of the process:
The concrete structures were ready in the ground and the purification steps are as follows:
DAF degreaser: flotation of fats with air and separate them from Wastewater
Balancing: To separate large suspended solids
Anaerobic treatment: in two parts aerated effluent to reduce BOD
Aerobic treatment: to remove microorganisms
Sedimentation: Post-aeration to settle the created sludge and enter the sludge concentration system
Employer: Gas Administration of Isfahan Province
Project Title:
- Design, purchase, installation and operation of the MBR package of Kelishad
Design and construction of wastewater treatment plant of Isfahan gas company, Qahdarijan branch, using SBR method
Description of the process:
- In order to set up the MBR package of the Gas Administration, a screen bar and MBR system has been used in the form of fixed plates
- B In order to design the SBR system of the gas administration, 5 steps have been designed:
In the first step, the wastewater enters from the septic to the aeration tank, and after aeration, the blower is turned off and
sedimentation takes place, and then chlorination is performed and the steps are repeated.
Address:
Isfahan – Chaharbagh Khajoo Street – Sadrkhajoo Office Complex, second floor – Unit 204
tell: 09132241275-09131123580
fax:03132732372
Email: peyvandabsepahan.co@gmail.com
Website: www.peyvandab-s.com
peyvandabsepahan.co