Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2695

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2699

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/output.class.php on line 3581
7dast – Sepahan Water Transplant Company
  • Private building Gray waste treatment
    project owner: Private consumer

    Location: Haft Dast, Isfahan
    Capacity:5 cubic meters
    Treatment methods: Biological and Filtration

The aim of this project was design and building a treatment unit for a private domestic building. The designed unit includes a 500-liter tank used as an equalizer, equipped with an aeration system. Later on, the wastewater will be pumped to sand filter, 3000-liter Sedimentation tank, Anthracite, and Activated Carbon filter, which are advanced with automatic back-wash. After chlorine injection, the treated wastewater is stored in a 3000-liter storage tank. An online Alarm application was designed and installed on for our costumer’s cell phone.