Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2695

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2699

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/output.class.php on line 3581
shirvan – Sepahan Water Transplant Company

Design, Construction, and Operation of Mashhad Prison Wastewater Treatment Plant

 

Method: Activated Sludge with Extended Aeration 

Capacity: 300 cubic meter per day (Population= 1500 people)

Table 1 Raw Wastewater Characteristics

Wastewater Volumetric Flow 300 cubic meter per day
Average Volumetric Flow Rate 5.12 cubic meter per hour
BOD5 250 (mg/lit)
COD 500
Total COD 130 kg per day
w/w Sedimented Solid 2-3%

Designed plant by Peyvand Ab Sepahan experts includes several unites which are listed below:

  • Racks and Screen

A bucket screener has been designed for this unit.

  • Expanded Aeration Tank
  • Secondary Sedimentation Tank
  • Chlorine injection tank
  • sludge Dewatering tank

Wastewater storage tank