Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2695

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/operations.class.php on line 2699

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home3/peyvanda/public_html/en/wp-content/plugins/revslider/includes/output.class.php on line 3581
morche – Sepahan Water Transplant Company

Pilot treatment plant of Morche-Khort Industrial City for Suspended Solid Removal

Project Owner: Morche-Khort Industrial City
Date: Summer 2016
Project Length: 45 days
Treatment Method: phytoremediation
The morche-khort treatment system is Reverse-Osmosis. in order to have an efficient treatment and improve the membrane lifetime, pre-treatment system is essential before wastewater enters the RO filtration. After testing in the pilot-scale, COD removal efficiency was 10%, TSS removal 80%. And 30% decrease in the animosity 30%. In conclusion, phytoremediation is economical as the pre-treatment unit of RO treatment plant

گیاه پالایی| شرکت پیوند آب سپاهان

شرکت پیوند آب سپاهان